Article audio is made possible by CAST11 Prescott Podcast Network. A Talking Glass Media production.
|
Paving work continues on Glassford Hill Road in Prescott Valley. Crews will move the work zone to the outside travel lanes on Tuesday, July 25 from Veterans Way to Main Street.
The left turn lane at Lakeshore Drive will open and the work zone will extend to the north limits of the project at Main Street (parallel to Panther Path Way). Drivers will need to follow posted detour routes for access onto Lakeshore Drive as the right turn lane will be closed during this phase. Alternate routes will be clearly marked.
View the Glassford Repavement Phase 1D-1F informational map.
Work hours are Monday through Friday from 7 a.m. to 7 p.m.
Drivers are encouraged to use extra caution while driving through the work zone. Please be mindful of construction personnel and equipment and obey the reduced speed limit.
Members of the project outreach team are available for those who have concerns or general project questions through the project hotline. The project hotline is monitored daily and can be reached at 928-275-2382.
Please stay tuned for continuing notifications and information on the Town website at https://www.prescottvalley-az.gov/1356/Glassford-Hill-Road-Enhancement-Project, Town social media such as Facebook, Instagram and Twitter, Town News, and the OurPV app, available in the App Store. The Town will also make direct contact with businesses and will have a phone line available for information and questions as construction begins.
Catch up with more Local News Stories on Signals A Z.com.

Leave a Reply