Signals AZ

London Bridge Road Pavement Rehabilitation


Article audio is made possible by CAST11 Prescott Podcast Network. A Talking Glass Media production.

Lake Havasu City Public Works Department, Engineering Division announced the paving reconstruction of the north segment of London Bridge Road.

Lake Havasu City, road work, London Bridge Road, pavement rehabilitation, road work, construction,

Traffic control devices and slowed construction zone speeds will be in place at various times from Highway 95 to Palo Verde S. from August 14, 2023, through August 18, 2023. All business access will be maintained during the duration of the project.

The Public Works Department is asking for residents and businesses for patience and cooperation during construction. Motorists traveling in the area can expect temporary delays due to construction. This is necessary to provide the public and the contractors with a safe route through the construction zone.

Lake Havasu City thanks residents for their assistance and reminds everyone to please exercise caution when driving through any construction areas. Questions can be directed to Lake Havasu City Public Works Department, Engineering Division at 928-453-4148.

Catch up with the news and read more stories from the River Cities.


Stay up to date on the Prescott Valley Outdoor Summit

Stay up to date on the 2023 Prescott Valley Outdoor Summit:

Sign up to receive text & email updates on central Arizona's annual outdoor event!
Name(Required)
SMS Messages(Required)

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.